Quote:
Originally Posted by russellw
The definitive answer....
For those of a technical mind we will be migrating from a dual Athlon server with 4 Gb of PC233 RAM, 2x120 Gb SATA drives and vb3.0.8 to a Quad core Intel chassis with 4 x 3.0 Quad Core Xeon CPU's, 8 Gb of ECC buffered RAM, 12 port SAS RAID controller and 4 x 320 Gb 15k SAS drives (2 active, 1 hot spare, 1 warm spare), DAT 320 Tape drive and full redundancy of power supplies, fans, NICs and RAID controller. At the same time the operating system has been upgraded to 64 bit Fedora and mySQL to Enterprise Server Gold.
Cheers
Russ
|
Wow, thats all the old server was running o.O good job lol.
Specs on the new server look pretty good